Openwater - 2011
Fabrication of a floating portal for the timing of Openwater swimming competitions.
Originally built for the Shanghai 2011 worlchampionship, it was then used for the London 2012 Olympic Games.
| Year: | 2011 and 2013 |
| Length: | 4,00m |
| Span: | 8,00m |
| Materials: | Epoxy glass fiber, honeycomb |
| Technology: | Wet layup in female molds |












